What is a side letter inspection right, and does imagery satisfy it?

A chain-link gate secured with a chain and padlock, with a road receding into the distance behind it.

A plain explanation of LP inspection rights in fund side letters, and why remote image verification is what gets used before a draw.

Most LPAs and side letters give certain LPs, usually the ones who negotiated hard or wrote the biggest check, a right to inspect portfolio assets. It shows up as a few lines buried in the side letter's "information rights" or "access" section, and almost nobody reads it again until a capital call lands that doesn't quite square with last quarter's completion report.

What the clause says

A typical inspection right gives the LP, on reasonable notice, the ability to visit a portfolio company's facilities or project sites, review books and records, and speak with management. In project-finance side letters it's often narrower and tied directly to construction milestones: the LP can confirm physical progress before funding the next draw. The language varies by fund counsel, but the intent is consistent: the LP wants a way to check the sponsor's own numbers against something independent before more capital goes out the door.

The problem is that the right, as written, assumes someone actually travels. Reasonable notice, site access, an escort, maybe a hard hat and a signed waiver. For a $40M logistics build two states over, that's a half-day round trip for a junior associate to confirm a pad is poured and steel is up, which it probably is, because sponsors don't usually lie about that part. They're more likely to round up on a percentage.

Why LPs rarely invoke it the hard way

In practice, the inspection right gets invoked rarely, and when it does, it's usually because something already looks wrong. That's the gap: the clause exists for routine verification, but the cost of using it, scheduling a visit, pulling an associate off two other deals, waiting for the sponsor to find a window, makes it a tool reserved for disputes rather than for catching problems early.

Most capital calls tied to construction milestones get funded off the sponsor's own draw request package: a completion percentage, some photos the GC took, and a project manager's sign-off. The LP's contractual right to check independently sits unused. Exercising it costs more than most draws are worth disputing over, even on the ones where the completion number feels a little generous.

What remote verification confirms

A before/after image pair pulled from very-high-resolution satellite or aerial imagery can't replace a full site visit for cause: pile depth and rebar spacing don't show up from overhead. What it can do is answer the three questions that drive most draw decisions: does the asset exist where the sponsor says it does, does the footprint match the acreage or square footage in the draw package, and does the visible construction state look consistent with the claimed percentage complete. For a mid-build logistics park or a solar array under development, those three checks catch the discrepancies that matter: a pad that's smaller than claimed, a building that's two phases behind, a parcel that hasn't broken ground at all.

That's close to what the inspection right is for on a routine draw: a sanity check against the sponsor's own report, confirmed before the wire goes out rather than after a dispute flares up. An on-demand image check built for exactly this moment in the draw cycle gets you that confirmation on the sponsor's reporting timeline instead of your travel calendar, without anyone at the portfolio company knowing you looked.

None of this touches the legal right itself. If a draw request looks genuinely off after the imagery comes back, that's when the side letter's full inspection clause, with its notice period and document access, earns its keep. For the routine check before the wire goes out, you don't need to invoke the clause to get the answer it was meant to give you.

If the next draw request needs a second set of eyes before you sign off, run one of these alongside it.

Get started

← Back to the blog