Notes on draw reviews and site checks

  1. Field notes: the warehouse that existed on paper before the forklifts

    A deal associate's notes on a parcel that lived in offering memos for two years before anything got poured, and what that gap costs you.

  2. What is proof of performance in a drawdown package?

    A plain look at what proof of performance means in a project finance drawdown package and what belongs in the documentation checklist.

  3. Free satellite basemap vs. tasked VHR imagery for a pre-draw site check

    What a free basemap shows you before a capital draw, where it runs out, and when tasked VHR imagery earns its cost.

  4. What is a side letter inspection right, and does imagery satisfy it?

    A plain explanation of LP inspection rights in fund side letters, and why remote image verification is what gets used before a draw.

  5. Field notes: the drone footage dated two months before the deal closed

    A diligence note on checking EXIF dates in sponsor drone decks, and why a two-month-old flyover shouldn't settle a draw request.

  6. What is a reliance letter, and why does a lender ask for one on a site report?

    A plain explanation of reliance letters on third-party site inspection reports, and why your lender or co-investor wants one before capital moves.

  7. How long does satellite imagery take before a capital call deadline?

    What drives satellite tasking turnaround before a draw, and why ordering imagery at the start of diligence beats a rush request at T-minus-two.

  8. What is an image capture date, and why it belongs in your deal file

    Capture dates are the part of a sponsor's progress photo nobody checks. Here's why that metadata matters before a capital call gets approved.

  9. Field notes: the draw request where the before photo was older than the deal

    A field-notes piece on catching a stale sponsor progress photo before a draw, and why an independently dated site image beats trusting a timeline.

  10. How to tell if a sponsor's progress photos are actually current

    Five checks for spotting stale or recycled sponsor progress photos in a construction draw package before you approve capital.

  11. How to catch a sponsor inflating a self-reported completion percentage

    Before you clear a draw request, here's how to check whether a sponsor's completion percentage and photos actually match what's built on site.

  12. Sponsor progress report vs. independent site confirmation before a draw

    What a sponsor's progress report proves before a capital draw, what it doesn't, and where independent site confirmation fills the gap.

  13. How to verify land control before a capital call

    A deal associate's guide to checking land control claims against the ground before signing off on a construction draw.

  14. Remote diligence check vs an on-site visit before a capital draw

    When a desk-based image check covers a capital draw and when you still need boots on the ground. A practical comparison for deal teams.

  15. How to confirm acreage on a parcel without ordering a new survey

    A deal associate's guide to checking a parcel's acreage against the PPM before closing, without waiting weeks for a new ALTA survey.

  16. What is a draw inspection, and who orders one?

    A draw inspection verifies construction progress before a lender releases funds. Here's who orders one, what it covers, and where it falls short.

  17. What is an independent engineer's certificate in construction lending?

    A plain explanation of the IE certificate in construction loans: who signs it, what it covers, and where it still leaves gaps before a draw.

  18. What resolution satellite imagery do you need to verify a building footprint?

    A plain-language look at ground sample distance and why 0.5m imagery is the practical floor for confirming a building footprint before a draw.