Notes on draw reviews and site checks
Field notes: the warehouse that existed on paper before the forkliftsA deal associate's notes on a parcel that lived in offering memos for two years before anything got poured, and what that gap costs you.
What is proof of performance in a drawdown package?A plain look at what proof of performance means in a project finance drawdown package and what belongs in the documentation checklist.
Free satellite basemap vs. tasked VHR imagery for a pre-draw site checkWhat a free basemap shows you before a capital draw, where it runs out, and when tasked VHR imagery earns its cost.
What is a side letter inspection right, and does imagery satisfy it?A plain explanation of LP inspection rights in fund side letters, and why remote image verification is what gets used before a draw.
Field notes: the drone footage dated two months before the deal closedA diligence note on checking EXIF dates in sponsor drone decks, and why a two-month-old flyover shouldn't settle a draw request.
What is a reliance letter, and why does a lender ask for one on a site report?A plain explanation of reliance letters on third-party site inspection reports, and why your lender or co-investor wants one before capital moves.
How long does satellite imagery take before a capital call deadline?What drives satellite tasking turnaround before a draw, and why ordering imagery at the start of diligence beats a rush request at T-minus-two.
What is an image capture date, and why it belongs in your deal fileCapture dates are the part of a sponsor's progress photo nobody checks. Here's why that metadata matters before a capital call gets approved.
Field notes: the draw request where the before photo was older than the dealA field-notes piece on catching a stale sponsor progress photo before a draw, and why an independently dated site image beats trusting a timeline.
How to tell if a sponsor's progress photos are actually currentFive checks for spotting stale or recycled sponsor progress photos in a construction draw package before you approve capital.
How to catch a sponsor inflating a self-reported completion percentageBefore you clear a draw request, here's how to check whether a sponsor's completion percentage and photos actually match what's built on site.
Sponsor progress report vs. independent site confirmation before a drawWhat a sponsor's progress report proves before a capital draw, what it doesn't, and where independent site confirmation fills the gap.
How to verify land control before a capital callA deal associate's guide to checking land control claims against the ground before signing off on a construction draw.
Remote diligence check vs an on-site visit before a capital drawWhen a desk-based image check covers a capital draw and when you still need boots on the ground. A practical comparison for deal teams.
How to confirm acreage on a parcel without ordering a new surveyA deal associate's guide to checking a parcel's acreage against the PPM before closing, without waiting weeks for a new ALTA survey.
What is a draw inspection, and who orders one?A draw inspection verifies construction progress before a lender releases funds. Here's who orders one, what it covers, and where it falls short.
What is an independent engineer's certificate in construction lending?A plain explanation of the IE certificate in construction loans: who signs it, what it covers, and where it still leaves gaps before a draw.
What resolution satellite imagery do you need to verify a building footprint?A plain-language look at ground sample distance and why 0.5m imagery is the practical floor for confirming a building footprint before a draw.